EZE İNŞAAT A.Ş. |
KOCAELİ PROVINCE GEBZE-DARICA METRO PROJECT PS LOGGING
MEASUREMENTS |
2020 |
KALYON İNŞAAT |
ISTANBUL ALIBEYKÖY CEBECI TUNNEL CROSS HOLE TOMOGRAPHY STUDIES |
2019 |
RTS JEOTEKNİK MÜHENDİSLİK |
İZMİR F.ALTAY-NARLIDERE KAYMAKAMLIK METRO PROJECT PS LOGGING MEASUREMENTS |
2018 |
ESAY |
İSTANBUL ÇEKMEKÖY-SANCAKTEPE-SULTANBEYLİ METRO PROJECT PS LOGGING MEASUREMENTS |
2018 |
GEOSAN |
ÇANAKKALE BOSPHORUS BRIDGE PS LOGGING MEASUREMENTS |
2017 |
JEO-ZEMİN |
İZMİR BÜYÜKŞEHİR BELEDİYESİ ÜÇYOL-BUCA METRO PS LOGGING MEASUREMENTS |
2017 |
İNCİ GRUP |
ANKARA – İZMİR HIGH SPEED TRAIN PROJECT AFYONKARAHİSAR – BANAZ SECTION INFRASTRUCTURE CONSTRUCTION KM:171+233 – 197+329 BETWEEN VIADUCT 1-2-3-4-5 GEOPHYSICS STUDY |
2016 |
GEOSAN |
ÇANAKKALE BOSPHORUS BRIDGE PS LOGGING MEASUREMENTS |
2016 |
YÜKSEL PROJE |
3. AIRPORT METRO STATIONS GEOPHYSICS STUDY |
2016 |
ALM SONDAJ |
SAMSUN-KALIN RAILWAY MODERNIZATION PROJECT PS LOGGING (BOREHOLE SEISMIC) INVESTIGATION |
2016 |
ALM SONDAJ |
SAMSUN-KALIN RAILWAY MODERNIZATION PROJECT PS LOGGING (BOREHOLE SEISMIC) INVESTIGATION |
2015 |
SİGMA – YDA – MAKİMSAN – BURKAY |
POLATLI – AFYONKARAHİSAR HIGH SPEED TRAIN PROJECT INFRASTRUCTURE CONSTRUCTION (km 128+500 – km 127+300 ) GEOPHYSICS STUDY |
2014 |
SKEC |
ISTANBUL THIRD BOSPHORUS BRIDGE PROJECT GEOPHYSICAL REPORT |
2013 |
ÖZDEMİR İNŞ. |
ERZİNCAN ERZURUM HIGHWAY MUT TUNNEL SLOPE INVESTIGATION |
2012 |
CENGİZ İNŞAAT |
ISTANBUL THIRD HIGHWAY AND BRIDGE CONNECTION PRELIMIARY GEOPHYSICAL REPORT |
2011 |
ZEMAR |
ISTANBUL STRAIT ROAD TUNNEL CROSSING PROJECT KUMKAPI HARBOUR PSLOG INVESTIGATION |
2011 |
MNG MAPA |
ISTANBUL THIRD HIGHWAY AND BRIDGE CONNECTION PRELIMIARY GEOPHYSICAL REPORT |
2011 |
YÜKSEL PROJE A.Ş. |
BURSA-ANKARA MOTORWAY 5. CUT RESISTIVITY TOMOGRAPHY STUDY |
2010 |
STFA A.Ş. |
ISTANBUL STRAIT ROAD TUNNEL CROSSING PROJECT HAYDARPASA HARBOUR PSLOG INVESTIGATION |
2010 |
ANADOLURAY OG |
KADİKÖY-KARTAL METRO OTOSAN STATION PS LOGGING STUDY |
2008 |
GEOS |
MARMARAY HALKALI STATION PS LOGGING MEASUREMENTS |
2008 |
ASTALDİ |
MARMARAY GEBZE-MALTEPE STATION CONSTRUCTION PS LOGGING STUDY |
2007 |
ANADOLURAY OG |
KADİKÖY-KARTAL RAIL SYSTEM YENİSAHRA STATION GEOPHYSICS STUDIES |
2005 |
ANADOLURAY OG |
KADİKÖY-KARTAL RAIL SYSTEM KADIKÖY STATION SEISMIC STUDY |
2005 |
STFA İNŞAAT A.Ş. |
ALTUNİZADE-ÜMRANİYE METRO ROUTE GEOPHYSICS STUDIES |
2004 |
GÜLSAN A.Ş. |
İSTANBUL-BURSA-BALIKESİR-İZMİR HIGHWAY BURSA SUÇEVRE CONNECTION WAY, 86+200 – 87+200 KM, SEISMIC REFRACTION STUDY REPORT |
2003 |
TEKFEN – IMPRESİT JV |
TAG MOTORWAY GEOPHYSICAL INVESTIGATION ON LANDSLIDE AREA AT KM 206 |
1998 |
MELEN JV / SPEKTRA JEOTEK A.Ş. |
İSTANBUL WATER SUPPLY PROJECT STAGE II MELEN SYSTEM CONTRACT 2 GEOPHYSICAL WORKS |
1997 |
MELEN JV /STFA TEMEL ARAŞTIRMA |
İSTANBUL WATER SUPPLY PROJECT STAGE II MELEN SYSTEM CONTRACT 1 GEOPHYSICAL WORKS |
1997 |
DOĞAN HARİTA |
ULAŞTIRMA BAKANLIĞI DLH GENEL MD. SİNCAN-YENİKENT-ERYAMAN-BATIKENT-ETİMESGUT SUBURBAN LINE GEOPHYSICS STUDY |
1994 |
ASTALDİ S.P.A. |
INVESTIGATION OF UNDERGROUND CONDITIONS WİTH GEOPHYSİCALMEASUREMENTS IN A LANDSLIDE AREA NEAR THE BRIDGE NO:1 |
1992 |
TEKFEN A.Ş. |
TAG MOTORWAY T1 TUNNELS GEOPHYSICS STUDIES |
1991 |
TEKFEN A.Ş. |
TAG MOTORWAY T2 TUNNELS GEOPHYSICS STUDIES |
1991 |
TEKFEN A.Ş. |
TAG MOTORWAY T3 TUNNELS GEOPHYSICS STUDIES |
1991 |
TEKFEN A.Ş. |
TAG MOTORWAY T4 TUNNELS GEOPHYSICS STUDIES |
1991 |
İGL-STFA J.V. |
ISTANBUL-BURSA MOTORWAY SEISMIC INVESTIGATION OF THE IZMIT BAY BRIDGE TRANSITION ROUTE |
1990 |
STFA İNŞAAT A.Ş. |
BALTALİMANI TUNNEL SEISMIC STUDIES |
1990 |
IN.CO. S.P.A. |
TAG MOTORWAY SV1 SPECIAL VIADUCT AREAS GEOTECHNICAL SURVEYS |
1990 |
IN.CO. S.P.A. |
TAG MOTORWAY SV2 SPECIAL VIADUCT AREAS GEOTECHNICAL SURVEYS |
1990 |
TEKFEN A.Ş. |
TAG MOTORWAY- AT SPECIAL VIADUCT AREAS SEISMOTECTONIC-SEISMIC RISK AND ENGINEERING GEOPHYSICS STUDIES |
1990 |
YÜKSEL PROJE A.Ş. |
SOUTH RAILWAY PROJECT NUSAYBİN-CİZRE-HABUR RAILWAY ROUTE SEISMIC REFRACTION STUDIES |
1989 |